Penetration Manager - Validation Tab
The Validation Tab helps in validating the configuration data and clash data. The data is defined and the changes are applied in the respective configuration file by using the Review option. The errors vanish from the Validation Tab once the ranges are available and data is populated in the Penetrations Tab of the Penetration Manager dialog.
Setting | Description | ||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Group by | The Group by option manages the project tree by sorting with either the Warning or Error header. It consists of the following two options in the drop-down list: Severity and Error type. | ||||||||||||||||||||||||||||||||||
Column List |
Lists the error details such as severity, error type etc, in a grid format on the right panel.
|
||||||||||||||||||||||||||||||||||
Configuration | Lists the configuration files from the drop-down. | ||||||||||||||||||||||||||||||||||
Clash check | Lists the clash check files from the drop-down. | ||||||||||||||||||||||||||||||||||
Ignore All | Ignores the warnings or errors that are generated. | ||||||||||||||||||||||||||||||||||
Refresh | Re-validates the cutting elements and host elements data. | ||||||||||||||||||||||||||||||||||
Close | Closes the Penetration Manager dialog without updating any changes. |